Drop a pin, fill the job, tap your soil layers — then send the block to Claude. Utah Septic Pros.
1 · Site location
2 · Job details
3 · Soil layers — tap the triangle
No layers yet — add from top down.
4 · Perc test (optional)
Enter presoak + your level readings — I compute drop, rate (elapsed ÷ drop), and the governing (slowest) hole. Leave empty to size from soil texture instead.
5 · Sizing & gravel take-off
6 · Generate packet
Runs entirely on your phone — no signal needed once loaded. Loading rate = R317-4 Table 6 (soil) or Table 5 (perc). Loads at 17 tons.