Labyrinth Construction · Utah Septic Pros — real pricing (Duracrete Jan · Southwest Jul 2026)
✎ Editing saved job —
Tank
$600 base to Spanish Fork; +$1.08/mi beyond. Pass-through, no markup.
Drainfield
≤ 2 ft stacks 6" rings · > 2 ft switches to culvert + adapter + lid.
Gravel & Haul
in
Total gravel = below-pipe depth + 6" (bed + cover). Tons = yd³ × 1.5. Loads = tons ÷ 17. Dump-truck haul auto-fills on the Labor side (loads × round-trip hrs × $135) and takes profit %.
Labor / Operating
Profit %
Qty × cost per line; profit % applies to labor. The 🚚 dump-truck haul auto-fills from the gravel calc (editable — ↺ resets to auto). Blank per-line % uses the section default.
Pricing
Materials only. Labor, equipment day-rates, excavation and sub work are bid separately off your standard methodology. Markup & tax apply to materials only; delivery/haul are untaxed pass-throughs.